Back

Hydroelectric Power Station “GURI”

Hydroelectric Power Station “GURI”

Power Generation and Power T&D

with a capacity of 10×400 MW
2009 – 2010
Puerto Ordaz, Venezuela.

Technical Supervision support for the engineering development, procurement, assembly and commissioning of 4 turbo generating units Francis (400 MW each one) – Plant upgrade.

IAC2017