Back

Dam “El Realito”

Dam “El Realito”

Water

with a capacity of 1,000
LPS. 2011 – 2015 (44 months)
San Luis Potosí, México
2011 – 2015

Executive supervision of the engineering, construction, procurement and commissioning. Gravity pipeline (14.1km-steel, 95.9km-concrete and 7.7km HDPE), pumping pipeline (15.2km-steel), pumping plants (3 x 1.02m3/s), tank for changing pressure (1,000m3), 5 tanks for distribution (16,000m3) and water treatment plant (1.0m3/s).

IAC2017